Energy-Saving Upgrade

Comprehensive energy saving project including LED lighting, occupancy sensors, smart heating & water controls, and Wi-Fi managed systems.

Perrys Vauxhall Barnsley Automotive / Commercial

CTE Contractors were appointed by Perrys Vauxhall Barnsley to deliver a complete electrical energy efficiency upgrade across their dealership. The site consisted of workshops, offices, corridors, staff areas, and external lighting, all of which relied on conventional systems that consumed unnecessary energy during low occupancy or out-of-hours periods.

The project objective was clear: reduce energy waste, modernise controls, and create an intelligent, automated system that would operate efficiently without requiring constant manual input from staff.

The Challenge

The dealership’s previous setup lacked automated control, meaning equipment, lighting, and heating often remained on for long hours even when areas were unoccupied. 

Key issues identified during the initial site survey included:

  • Lighting was left running continuously in low-traffic areas such as corridors, WCs, and store rooms.
  • Panel heaters operate throughout the day, regardless of occupancy.
  • Water heaters are powered 24/7, leading to unnecessary electricity use overnight and at weekends.
  • External lighting running on basic timers without sensitivity to daylight hours or actual usage.
  • Office lights are manually controlled, frequently left on after working hours.

These inefficiencies resulted in high energy bills and avoidable carbon emissions. Perrys wanted a modern, sustainable, and low-maintenance solution that would integrate seamlessly with daily operations.

The Solution

Following a detailed energy assessment, CTE Contractors designed and installed a site-wide intelligent control system that combined automation, LED lighting, and smart connectivity.

Lighting Controls

  • PIR (Passive Infrared) Sensors were installed in corridors, WCs, and storerooms to automatically switch lights on when movement was detected and off after a set period of inactivity.
  • Occupancy Sensors were fitted in office areas to ensure lights were only active when spaces were in use, eliminating energy waste during meetings, breaks, or after hours.
  • All existing fluorescent and halogen fittings were upgraded to high-efficiency LED luminaires, improving light quality and reducing power consumption by over 60%.
  • External Lighting was reconfigured with energy-efficient controls to respond to ambient light levels, ensuring illumination only during low-light periods.

Heating & Power Management

  • Countdown Timers were fitted to panel heaters, ensuring they could not be left on all day. Staff can activate heat when required, with automatic shutdown after a set duration.
  • Wi-Fi-controlled sockets were installed for plug-in equipment such as display units, computers, and chargers. These can now be switched off remotely or scheduled to power down outside working hours.
  • Wi-Fi-controlled water heater systems were introduced, allowing the dealership to schedule operation only during business hours. This prevented constant standby heating and further reduced daily electricity use.
  • Heating Controls were programmed to maintain comfort levels during opening hours while optimising performance based on occupancy and temperature conditions.

All systems were networked through a user-friendly control interface, enabling Perry's management to monitor and adjust settings from any connected device.

“This project was about integrating energy efficiency into every part of the dealership, from lighting to heating, without affecting comfort or convenience. Smart controls make savings automatic, not manual.”
CTE Contractors Project Manager

The Results

The completed installation delivered impressive operational and environmental improvements across the site:

  • Overall energy reduction of around 40% compared to pre-installation levels
  • Lighting energy consumption cut by over 60% following the LED rollout and sensor integration
  • Reduced equipment run time through automated Wi-Fi controlled sockets and heaters
  • Lower maintenance costs due to long-life fittings and automated operation
  • Improved working environment with consistent lighting and comfortable temperatures
  • Enhanced sustainability credentials supporting the dealership’s environmental targets

The smart controls now run automatically, optimising efficiency throughout the day. Perrys’ team also benefits from greater flexibility, being able to override or schedule systems directly from their devices.

Key Benefits

  • Up to 40% energy reduction across the site 
  • Fully automated control of lighting, heating, and plug-in systems 
  • Reduced maintenance and extended equipment lifespan 
  • Improved comfort, safety, and environmental performance
  • Smart Wi-Fi-based system for simple, remote management

Conclusion

This energy-saving project highlights how CTE Contractors combines technical expertise with modern smart controls to help commercial clients cut energy costs, improve sustainability, and future-proof their facilities.

Looking to make your business more energy efficient?

Contact CTE Contractors for a free energy saving consultation.

Schedule a energy saving site survey

What Our Clients Say

We’re really pleased with the results. The new systems have made a noticeable difference everything now runs automatically, so we’re not worrying about lights or heaters being left on. 

The energy savings have been clear in our recent bills, and the improved lighting and comfort levels have made the site feel brighter and more efficient. 

CTE managed the project smoothly and worked around our business hours without disruption.

Service Manager, Perrys Vauxhall Barnsley

We’re extremely pleased with the EV charging installation carried out by CTE Contractors. The chargers are reliable, easy to use, and professionally installed.

The new system helps us meet the growing demand for EV sales and supports our commitment to sustainability.

General Manager, Perrys Vauxhall Barnsley

CTE Contractors did a fantastic job from start to finish. The new LED lighting has completely transformed the look and feel of our site the workshop is brighter, the offices look more professional, and we’ve already noticed a drop in our electricity usage.

The installation was handled smoothly with no disruption to our daily operations.

We’d happily recommend CTE to any business looking to upgrade their lighting.

Service Manager, Perrys Vauxhall Barnsley