EV Charge Point Installation

Supply, installation, and commissioning of dual Rolec EV chargers with dedicated distribution and load management.

Perrys Vauxhall Barnsley Automotive / Commercial

CTE Contractors were appointed to design and install a new EV charging infrastructure for Perrys Vauxhall Barnsley to support the growing demand for electric vehicle sales and servicing.

The project involved installing dual 7.2kW Rolec pedestal EV charge points, connected via a new dedicated EV distribution board and full compliance with BS7671 wiring regulations. 

The Challenge

As Perrys expanded their electric vehicle range, the dealership required reliable and compliant charging infrastructure to meet both customer and operational needs.

  • Existing electrical systems had limited capacity for additional load.
  • Safety and regulatory compliance under BS7671 (including O-PEN protection) were essential.
  • Chargers needed to operate efficiently without overloading the existing supply.
  • The installation had to be durable and weather-resistant for long-term outdoor use.

The goal was to create a system that provided safe, efficient, and scalable EV charging while maintaining full compliance and minimising disruption to the busy dealership.

The Solution

CTE Contractors delivered a complete turnkey EV charging installation, designed for reliability, safety, and future expansion.

EV Charger Installation

  • Installed Rolec dual 7.2kW pedestal units suitable for commercial use, offering simultaneous charging for multiple vehicles.
  • Chargers were mounted in customer and operational areas for maximum convenience.

Electrical Infrastructure

  • A dedicated EV distribution board was installed, complete with an O-PEN protective device, ensuring full compliance with BS7671:2018 (Amendment 2).
  • All cabling was installed in steel wire armoured (SWA) cable for durability and external protection.
  • Cable runs were mounted neatly on galvanised cable tray, maintaining a professional and maintainable finish.
  • The system was fitted with a load management controller, designed to monitor total power usage and prevent overload conditions during peak demand.

Testing & Commissioning

  • The full system was tested, inspected, and certified in accordance with current IET Wiring Regulations.
  • Chargers were fully commissioned and integrated into Perrys’ operational workflow, with demonstration and user guidance provided on completion.

“This project demonstrates our commitment to helping automotive clients transition to electric mobility. Every part of the installation was designed for safety, efficiency, and compliance.”
CTE Contractors Project Manager

The Results

The completed installation provides reliable EV charging infrastructure for Perrys dealership operations, ensuring they can fully support their growing range of electric vehicles.

  • Dedicated EV distribution ensures safe and compliant power delivery
  • The load management system protects the building’s electrical supply from overload
  • Robust installation using SWA cabling and tray for long-term durability
  • Fully tested and commissioned to BS7671 standards
  • Scalable design allows future expansion as EV demand increases

Key Benefits

  • Fully compliant with BS7671 and O-PEN protection
  • Safe, efficient EV charging for commercial use 
  • Smart load management prevents overloads
  • Professional cable management and installation quality
  • Supports growing EV vehicle sales and customer service

Conclusion

The Perrys Vauxhall Barnsley EV charging project showcases CTE Contractors’ expertise in designing and installing safe, compliant, and future-ready EV infrastructure for commercial clients.

Looking to install EV charge points at your business?

Contact CTE Contractors for a free consultation and site survey.

Book a EV site survey

What Our Clients Say

We’re extremely pleased with the EV charging installation carried out by CTE Contractors. The chargers are reliable, easy to use, and professionally installed.

The new system helps us meet the growing demand for EV sales and supports our commitment to sustainability.

General Manager, Perrys Vauxhall Barnsley

We’re really pleased with the results. The new systems have made a noticeable difference everything now runs automatically, so we’re not worrying about lights or heaters being left on. 

The energy savings have been clear in our recent bills, and the improved lighting and comfort levels have made the site feel brighter and more efficient. 

CTE managed the project smoothly and worked around our business hours without disruption.

Service Manager, Perrys Vauxhall Barnsley

CTE Contractors did a fantastic job from start to finish. The new LED lighting has completely transformed the look and feel of our site the workshop is brighter, the offices look more professional, and we’ve already noticed a drop in our electricity usage.

The installation was handled smoothly with no disruption to our daily operations.

We’d happily recommend CTE to any business looking to upgrade their lighting.

Service Manager, Perrys Vauxhall Barnsley