Showroom Refurbishment

Full electrical refurbishment including LED lighting, decorative and functional feature lighting, power and data infrastructure, and safety system upgrades.

KIA Huddersfield Automotive / Commercial

CTE Contractors were appointed to carry out the full electrical installation for the showroom refurbishment at KIA Huddersfield. The goal was to deliver a bright, energy-efficient, and visually striking space that met KIA’s corporate lighting and branding standards, while ensuring functionality for both staff and customers.

The project required a combination of precision lighting design, smart power distribution, and compliance upgrades to create a professional, high-impact dealership environment.

The Challenge

The existing electrical and lighting systems were outdated and no longer suited to the modern KIA showroom specification.

  • Lighting levels in the display areas were inconsistent and failed to meet the manufacturer’s lux requirements for vehicle presentation.
  • The fire alarm and emergency lighting systems were below current standards and needed upgrading to ensure compliance.
  • The layout required new power and data distribution to accommodate additional office space and display features.
  • Floor sockets and specialist circuits were needed to allow vehicles to be powered for display without visible cables.

KIA wanted a clean, efficient, and brand-aligned environment that enhanced the customer experience and supported staff workflow.

The Solution

CTE Contractors carried out a complete electrical refurbishment with a focus on lighting design, compliance, and functionality.

Lighting Installation

  • Installed full LED showroom lighting to achieve the precise lux levels specified by KIA for vehicle presentation, ensuring consistent, high-quality illumination across all display areas.
  • Added decorative pendant lighting over the customer waiting area and sales desks to enhance the modern, premium showroom feel.
  • Installed suspended track lighting above the central show car, providing focused illumination and flexibility for vehicle rotation or layout changes.
  • Fitted branded signage lighting, highlighting KIA’s logo and corporate branding features both internally and externally.

Power and Data Infrastructure

  • Installed new dado trunking systems in office areas to provide accessible power and data outlets for staff, improving functionality and workspace flexibility.
  • Fitted floor-mounted power sockets positioned beneath display vehicles, allowing cars to be plugged in discreetly for lighting and battery maintenance during customer viewings.

Safety and Compliance Upgrades

  • Altered and upgraded the fire alarm and emergency lighting systems to bring them up to the latest safety standards.
  • Integrated new emergency luminaires and call points seamlessly within the refurbished layout to maintain compliance without compromising aesthetics.

All work was completed on a live site under a tight programme, coordinated with other contractors to meet project deadlines and ensure minimal disruption to showroom operations.

“The KIA Huddersfield project allowed us to combine energy efficiency with showroom quality presentation. Every lighting circuit and fitting was chosen to enhance the display environment and meet KIA’s brand standards.” CTE Contractors Project Manager

The Results

The completed refurbishment transformed the dealership into a modern, efficient, and visually impressive showroom.

  • Perfectly balanced LED lighting achieves the required lux levels for vehicle displays
  •  Improved energy efficiency through LED upgrades and smart power distribution
  • Enhanced aesthetics with decorative pendant and track lighting designs
  • Upgraded fire and emergency systems meeting current compliance standards
  • Seamless customer experience with powered vehicles and illuminated signage

The finished showroom now reflects KIA’s brand image, bright, inviting, and technologically advanced, while delivering practical benefits in energy savings and ease of operation.

Key Benefits

  • Energy-efficient LED showroom and feature lighting 
  • Lighting designed to meet KIA’s lux level standards
  • Smart power and data solutions for flexible workspace use
  • Fully compliant fire alarm and emergency lighting system
  • Enhanced visual impact for customers and staff

Conclusion

The KIA Huddersfield showroom refurbishment showcases how CTE Contractors combine technical skill, brand awareness, and attention to detail to deliver commercial electrical projects that look exceptional, perform efficiently, and meet the highest safety standards.

Planning a showroom or office refurbishment?

Contact CTE Contractors for a free consultation and lighting design review.

Book a site survey

What Our Clients Say

CTE Contractors delivered exactly what we needed for our new showroom. The lighting design really brings out the vehicles, and the overall space feels premium and professional. The installation was completed to a high standard and coordinated perfectly with our refurbishment schedule. The new power and data layouts make daily operations much easier.

General Manager, KIA Huddersfield

We’re really pleased with the results. The new systems have made a noticeable difference everything now runs automatically, so we’re not worrying about lights or heaters being left on. 

The energy savings have been clear in our recent bills, and the improved lighting and comfort levels have made the site feel brighter and more efficient. 

CTE managed the project smoothly and worked around our business hours without disruption.

Service Manager, Perrys Vauxhall Barnsley

CTE Contractors did a fantastic job from start to finish. The new LED lighting has completely transformed the look and feel of our site the workshop is brighter, the offices look more professional, and we’ve already noticed a drop in our electricity usage.

The installation was handled smoothly with no disruption to our daily operations.

We’d happily recommend CTE to any business looking to upgrade their lighting.

Service Manager, Perrys Vauxhall Barnsley
Loading…
Loading the web debug toolbar…
Attempt #